5,977

professionals

ACROSS THE COUNTRY

nord 2,005 in the north

nord 2,754 in the centre

(including Sardinia)

nord 1,218 in the south

(including Sicily)

figures as 31/12/2024

including Tamini, Avvenia, LT and Brugg

75,236 Km

of power lines managed

915 electrical substations

4 control centres

312*TWh

Demand of electricity
(*provisional figure)

nuove stazioni icona terna 380 kV NTG Substation

linea 380 icona terna 380 kV NTG line

linea 380 in cavo icona terna≥380 kVcc NTG line,

cable

figures as 31/12/2024



> Learn about the evolution of the Italian National Transmission Grid: the 2025 Development Plan sets out over 23 billion euros in investments to facilitate the integration of renewables and increase transport capacity.

MAIN OFFICES

  • Turin

  • Milan

  • Padua

  • Florence

  • Rome

  • Naples

  • Cagliari

  • Palermo

offices icon ternaOffices
plant units icon ternaPlant units

ACROSS THE COUNTRY

12 professionals

(seconded personnel included)


INTERCONNECTIONS

Italy - Montenegro HVDC

  • 445 km long

  • 600 MW power


OFFICE

Podgorica

figures as 31/12/2024

3

professionals

BY COUNTRY

perù 3 in Peru

(seconded personnel included)

figures as 31/12/2024

PERU

  • Aguaytía - Pucallpa

  • Mato Grosso

PERU

  • Lima


CHILE

  • Santiago