5,446

professionals

ACROSS THE COUNTRY

nord 1,914 in the north

nord 2,457 in the centre

(including Sardinia)

nord 1,075 in the south

(including Sicily)

data as 31/12/2023

including Tamini, Avvenia, LT and Brugg

75,140 Km

of lines managed

910 electrical substations

4 control centres

306.1*TWh

Demand for electricity
(*provisional figure)

nuove stazioni icona terna 380 kV NTG Substation

linea 380 icona terna 380 kV NTG line

linea 380 in cavo icona terna Line ≥ 380 kVcc NTG,

cable

data as 31/12/2023

5

new electricity backbones

The Hypergrid network, one of the main new feature introduced by the 2023 Development Plan, will leverage the technologies of the HVDC (High Voltage Direct Current) transmission system to integrate renewable capacity and to achieve the energy transition and security targets

Undersea HVDC

Modernisation from Alternating Current (AC) to Direct Current (DC)

Modernisation of Alternating Current (AC)

Over €21 billion

in investments

The main strategic infrastructure projects included by Terna in the 2023 Development Plan to meet national and international decarbonisation targets

Interconnections

Grid development

30

cross-border
interconnections

Works for development of interconnection capacity for a sustainable and integrated Europe

interconnessioni icona terna Interconnections

MAIN OFFICES

  • Turin

  • Milan

  • Padua

  • Florence

  • Rome

  • Naples

  • Cagliari

  • Palermo

offices icon ternaOffices
plant units icon ternaPlant units

ACROSS THE COUNTRY

11 professionals

(seconded personnel included)


INTERCONNECTION

Italy - Montenegro HVDC

  • 445 km long

  • 600 MW power


OFFICE

Podgorica

data as 31/12/2023

36

professionals

BY COUNTRY

brasile 33 in Brazil

(seconded personnel included)

perù 3 in Peru

(seconded personnel included)

data as 31/12/2023

BRAZIL

  • Linha Verde I

(Statw of Minas Gerais)


PERU

  • Aguaytía - Pucallpa

  • Mato Grosso

BRAZIL

  • Belo Horizonte


PERU

  • Lima


CHILE

  • Santiago