Power lines demolished (KM)(*)


(*)The figure for 2016 is exceptional due to the demolition of over 200 km of obsolete power lines in Valtellina, which had been in preparation in previous years. After adjusting for this removal, demolitions amounted to approximately 80 km, in line with previous years (around 100 km per year). The exceptional performance in 2019 was due to a speedier execution of programmes that year, with a consequent reduction in the targets for 2020 and 2021.